Tymor Energy Carbon Emission Reduction Consultancy
We continually research advances in technology, and it is this knowledge that allows Tymor Energy to assemble an efficient and cost effective low carbon heating and ventilation system. Tymor Energy’s management have completed real life projects showing a 50% reduction in C02 emissions to comply with current Building Regulations.
Gone are the days when mismatched or poorly controlled plant and equipment are allowed to linger after handover to the client. We will work with architects and installation contractors to ensure the plant is correctly installed, commissioned and operated as designed. Unlike other consultancies who may move on to the next project, Tymor Energy will be on hand for 2 years after the building is handed over to ensure low carbon success. This extended involvement is critical to the optimisation of the plant achieving the results the plant is capable of.
Carbon Emission Reduction Process
Tymor Energy undertakes in-depth modelling and analysis of the building fabric, to identify the causes of the carbon emissions -we only suggest replacing what is absolutely necessary. An example of this would be reusing Victorian radiators on a modern heating system within the same Victorian building, The same process is adopted for new builds.
Designing and Developing Hydro Schemes
Tymor Energy have a track record as an independent consultant, providing plant design based on our extensive knowledge of the most up to date and efficient plant items available. It is this combination and subsequent operation of the plant where most efficiencies occur.
